Kohler K-110 Guia De Instalacion página 4

Ocultar thumbs Ver también para K-110:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Pipe
Holder
Rod
Overflow
Tee
Elbow
Bracket
Setscrew
1. Freestanding Supply Installation
Remove the temporary plugs from the water supply couplings.
For K-710, K-711, K-712, K-726 and K-727: Replace the long rod
with the short rod. To determine the bath-to-drain faucet
measurement for your bath model refer to the "Roughing-In"
section of this manual.
Thread the tee bracket into the hole in the back of the overflow
elbow on the bath.
Insert the rod into the tee bracket and secure with the setscrew.
Install the Supply Tubes
Loosen the setscrews in the pipe holder and flange.
Carefully slide the plated supply pipe through the pipe holder
and flange.
Thread the supply pipe into the supply rough-in and tighten it
with a strap wrench.
Tighten the setscrews in the pipe holder and flange.
Repeat for the second supply tube.
1008209-2-H
Pipe Holder
Plated
Supply Pipe
Flange
Setscrew
4
Tee
Bracket
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-331K-6905K-16210

Tabla de contenido