Control Panel Display; Warning Signals - Gaggia Milano BRERA Instrucciones Para El Uso

Ocultar thumbs Ver también para BRERA:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CONTROL PANEL
DISPLAY
Ready Signals
• The machine is ready for brewing coffee
from bean and hot water dispensing.
Steady on
• The machine is ready for pre-ground
coffee brewing.
Steady on
• The machine is in the steam dispensing
phase.
Steady on
• The machine is in the hot water dis-
pensing phase.
Steady on
• The machine is brewing 1 espresso
coffee or a long coffee.
Steady on
• The machine is brewing 2 espresso
coffees or 2 long coffees.
Steady on
• The machine is programming the
amount of coffee to be brewed each
time the "
pressed.
Blinking
• 26 •
• 26 •
4219-465-04361 GAG. MAN. BRERA US EN-ES-PT Rev 00.indd 26
" or "
" button is

Warning Signals

• The machine is warming up to brew
coffee and dispense hot water or steam.
Blinking
• The machine is performing the rinse
cycle.
Wait until the machine stops the opera-
tion.
Cyclic blinking
• The machine needs a descaling cycle.
Steady on
• The machine needs water circuit prim-
ing.
Blinking
15/10/2020 12:06:55

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

037rg

Tabla de contenido