Typical Installation
INSTALLATION
1
1. Gate Valve
2. Check Valve
3. Union
3
2
7
9
10
11
4. Switch Power
7. Discharge
5. Pump Power
8. Gas Tight Basin
6. Vent
9. Intake
4
5
10. Caulking Hub
"
11. 3/16
Air Bleed Hole
12. Tethered Float (see Specifications tables)
INSTALLATION
Typical Installation
6
8
12
5