Installation; Foundation - Graf STABILUS 3.000 L Instrucciones De Instalación Y Mantenimiento

Foas séptica
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Tank
Compacted base layer
Soil
Surround
(round gravel,
grain 4/ 16 acc. to DIN 4226-1)
Dome shaft with telescopic top
piece
Covering layer
according to DIN 4124

5.1 Foundation

The following criteria must be verified prior to installation:
The structural suitability of the soil in accordance with DIN 18196
Maximum groundwater levels/ drainage of the subsoil
Types of loading present, e. g. traffic load
A soil survey should be requested from the local building authority to determine the physical properties of
the soil.
5.2 Checks prior to installation
Immediately before installing the tanks in the trench, the competent person from the installation contractor
must check and document that:
The seal and tank wall are undamaged
The tank is properly sealed
The installation system is properly installed
The trench is properly constructed, in particular that the dimensions and bed are correct
The granuality of the material for the gravel surround (evidence provided by delivery slip) and fill-
ing material
The soil must correspond to group 1 or 2 in accordance with ATV work sheet 127
Certificates demonstrating the stated characteristics should be presented to the authorities re-
sponsible
mail@graf.info
www.graf.info

5. Installation

12 / 32
Highest groundwater level
(widest point of tank)
*

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

102017

Tabla de contenido