Uline H-951 Manual Del Usuario página 5

Ocultar thumbs Ver también para H-951:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

NOTE: You will need two 2 x 4" wood planks for
this process.
1.
Remove outer corrugated box from pallet.
(See Figure 11)
Figure 11
2. Using 13 mm socket,
remove two bolts that
secure shrink tunnel to
pallet. (See Figure 12)
3. Place corrugated flat sheet or blanket on the
3. Place corrugated flat
floor toward the backside of shrink tunnel.
sheet or blanket on the floor toward the backside of
(See Figure 13)
shrink tunnel. (See Figure 13)
4. Place two 2 x 4" wood planks perpendicular to the
tunnel as shown. (See Figure 13)
Figure 13
PAGE 5 OF 21
INSTALLING LEG KIT WITHOUT FORKLIFT
Figure 12
5. Rest the shrink tunnel on the planks, exposing the
bottom of tunnel. (See Figure 14)
Figure 14
6. With tunnel resting on its backside, make sure power
cord is free from damage. (See Figure 15)
Figure 15
Power Cord
7.
Using 10 mm socket,
remove two metal
straps that secured the
tunnel to pallet.
(See Figure 16)
8. Using 10 mm socket,
remove four rubber
bumpers.
(See Figure 17)
Figure 16
Figure 17
0421 IH-951

Publicidad

Tabla de contenido
loading

Tabla de contenido