Ingeteam INGECON SUN EMS Manual De Configuración página 53

Ocultar thumbs Ver también para INGECON SUN EMS:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Ingeteam
Single-phase installation*
*A jumper must be connected between points 1
and 4 of the wattmeter.
The wattmeter must be installed upstream from the power consumption and
production installation.
RS-485 communications are as indicated in the following table.
Pin
42
41
43
The end of line resistor must be connected between connection points 41 and 42.
Consult the accessories manual for communication via RS-485 for more
information on the RS-485 wiring.
AAX2026IQM05_B.docx
Signal
RS-485 B (+)
RS-485 A (-)
GND
Three-phase installation
120 Ω
Configuration manual
53

Hide quick links:

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido