Chapin 81000A Manual De Uso Y Cuidado página 3

Ocultar thumbs Ver también para 81000A:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

• Assemble linkage to bail assembly (Fig. A).
• Assemble linkage to rotate link (Fig. B).
• Rotate the turnbuckle to adjust the gate (Fig. C).
Bail Position for adjusting Gate:
1) Bail must be in rest position for Gate Closed.
2) Bail must be depressed for Gate Open.
AUGER ASSEMBLY
FLAT AUGER ASSEMBLY
Thread auger clockwise onto impeller shaft. Screw
auger retaining nut into auger hole with M6 socket
driver. Tighten completely with wrench to secure.
Choose flat auger for general turf applications.
• Fertilizers
• Herbicides
• Pesticides
• Grass Seed
• Free-Flowing Material
Figure A
Chapin Spreader Operator's Manual - English
Fully Assembled
2E
To Close Gate
(Increase Length)
To Open Gate
(Decrease Length)
Figure C
Figure B
AUGER
NUT
FLAT
AUGER
IMPELLER
SHAFT

Publicidad

Tabla de contenido
loading

Tabla de contenido