Kohler K-T15290 Guia De Instalacion página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Plastic
Handle
Spline
Adapter
Apply Plumbers
Putty.
Screw
Valve Stem
Brass Spline
Valve Body
Adapter
Threaded
Sleeve
Valve Stem
Finished
Height
Surface
Measurement
4. Installing Lever Handles
Close the valves (hot = clockwise, cold = counterclockwise).
Apply plumbers putty or other sealant to the underside of the
escutcheon according to the manufacturer's instructions.
Thread the escutcheon onto the valve body and hand tighten.
Remove any excess putty or sealant.
Measure the distance from the top of the valve stem to the
finished deck.
If the valve stem height is 2-1/16" (5.2 cm) to 2-5/16" (5.9 cm),
remove the threaded sleeve and replace it with the threaded
adapter supplied.
Use the brass spline adapter and screw when the valve stem
height is between 1-13/16" (4.6 cm) and 2-1/8" (5.4 cm).
Use the plastic spline adapter when the valve stem height is
between 2-1/8" (5.4 cm) and 2-5/16" (5.9 cm).
If the brass spline adapter is required, attach it using the screw
supplied. The plastic spline adapter does not need a screw.
Position the handle assemblies facing in opposite directions, away
from the spout assembly.
If the handles are not properly aligned lift the handle off the
spline adapter and move the spline adapter one or two ridges
until the handle is properly aligned.
1012829-2-C
Hot
Orientation Of Handles
In Off Position
6
Cold
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-t15294K-t15294-7T15294-4-cpK-t15294-4

Tabla de contenido