Complete The Installation - Kohler K-T15290 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Spout
Aerator

6. Complete the Installation

Turn off the water (hot = clockwise, cold = counterclockwise).
Remove the aerator assembly.
Turn on the main water supply and check for leaks.
Turn on the hot and cold valves and run water through the spout
to remove debris. Check for leaks.
Turn off the hot and cold valves.
Reinstall the aerator assembly.
Kohler Co.
9
1012829-2-C

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-t15294K-t15294-7T15294-4-cpK-t15294-4

Tabla de contenido