Installation; Unpacking And Inspection - Tripp-Lite BP240V65 Manual Del Propietário

Gabinete de baterías para autonomía extendida
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Installation

Note: Before installation, inspect the unit. Ensure nothing inside the package is damaged. Retain the original packing material in a safe
place for future use.
5.1 Unpacking & Inspection
Any damage to packaging should be noted with the delivery carrier at the time of receipt.
Remove the rail kit, battery enclosure, and battery modules from the packaging.
Note: The battery modules are very heavy. Be cautious when unpacking and lifting the unit to avoid injury
• Don't tilt the battery pack when removing it from the packaging.
• Inspect the battery cabinet for damage that may have occurred from transport. If damage is found, do not turn on
the unit. Contact the dealer from whom the unit was purchased immediately.
• Check the accessories according to the packing list and contact the dealer in case of missing parts.
1. Hold the sliding plate steady.
Cut and remove the binding tapes.
3. Remove the packing foam and the beveled pallet.
2. Remove the plastic bag and the shipping carton.
4. Remove the bolts securing the cabinet to the
shipping pallet.
15
.

Publicidad

Tabla de contenido
loading

Tabla de contenido