Performance Data - Zoeller SHARK 803 Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

RECOMMENDED INSTALLATION FOR ALL APPLICATIONS
(1) Electrical wiring and protection must be in accordance with National
Electrical Code and any other applicable state and local electrical
requirements.
(2) Install proper Zoeller unicheck (combination union and check valve),
preferably just above the basin (indoor installations) to allow easy removal
of the pump for cleaning or repair. If high head or below cover installation
is required use 30-0164 on 1-1/2" (DN40) pipe, 30-0152 on 2" (DN50) pipe
and 30-0160 on 3" (DN80) pipe.
(3) All installations require a basin cover to prevent debris from falling into
the basin and to prevent accidental injury.
(4) When a Unicheck is installed, drill a 3/16" (5 mm) dia. hole in the discharge
pipe even with the top of the pump.
BELOW THE BASIN COVER AND CLEANED PERIODICALLY. (
unit see #3 under "Caution" on front page). Water stream will be visible
from this hole during pump run periods.
GATE OR BALL VALVE
10
UNICHECK
2
FULL SIZE DISCHARGE PIPE
6
BASIN LID
3
BASIN
7
PIGGYBACK FLOAT
11
3/16" (5 mm)
4
DIA.
9
WEEP HOLE
All installations must comply with all applicable
electrical and plumbing codes.
60
18
55
16
50
14
45
40
12
35
10
30
8
25
20
6
15
4
10
2
5
0
5
GALLONS
LITERS 0
20
NOTE: THE HOLE MUST ALSO BE
High Head
INSTALLATION SKETCHES
1
VENT
13
GAS TIGHT SEALS
TAPE OR CLAMP
GRINDER PUMP
10 cm (4") OF GRAVEL

PERFORMANCE DATA

PUMP PERFORMANCE CURVE
MODEL 803/805/807
807
805
803
10
15
20
25
30
35
40
60
80
100
120
140
FLOW PER MINUTE
© Copyright 2021 Zoeller
(5) Securely tape or clamp power cord to discharge pipe, clear of the float
mechanism(s).
(6) Use full-size discharge pipe.
(7) Basin must be in accordance with applicable codes and
specifications.
(8) Pump must be level and float mechanism(s) clear of sides of basin before
starting pump.
(9) Basin must be clean and free of debris after installation.
(10) Gate Valve or Ball Valve to be supplied by installer and installed
according to any and all codes.
(11) For nonautomatic pumps, locate float switches as shown in sketches. The
best place for the "off" point is above the motor housing and positioned 180°
from the inlet. Never put "off" point below discharge on pump
(12) Gas tight seals required to contain gases and odors.
(13) Vent gases and odors to the atmosphere through vent pipe.
TYPICAL FLOAT HANGER ON STEEL COVER PITS
12
5
8
PEA GRAVEL
On some installations it may be desirable to install an independent hanger for
the level control switches to avoid possible hang ups on the pumps, piping,
valves, etc. Float hangers are available from Zoeller Company on Catalog
SK3108
Sheet FM0526 or can be fabricated from standard pipe and fittings.
MODEL
Feet
5
10
20
30
40
50
Shut-off Head:
40
45
50
160
180
Co. All rights reserved.
®
3
ACCESS COVER
PVC OR LIGHT WEIGHT
STAINLESS STEEL PIPE
TOTAL DYNAMIC HEAD/FLOW
PER MINUTE
SEWAGE
803
805
Meters
Gal.
Liters
Gal.
Liters
Gal.
1.5
35
132
40
151
45
3.0
31
117
37
140
42
6.1
22
83
29
110
35
9.1
9
34
20
76
27
12.2
--
--
8
30
18
15.2
--
--
--
--
7
35 ft. (10.7 m)
45 ft. (13.7 m)
55 ft. (16.8 m)
STANDARD PIPE
FLANGE
SK1217
807
Liters
170
159
132
102
68
26
153604

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Shark 805Shark 807