Inside Panel
Connectors (tall)
Outside Panel
Connectors (short)
Clean-Out
Make sure the front side of
the top track faces out.
2. Locate the Wall Jambs
Position the wall jambs against the wall. Make sure they clear any curves.
NOTE: The wall jamb must sit flat on the bottom ledge. If your ledge has a curve in the corners at the side
wall, it may be necessary to shape the bottom end of the wall jamb with a file.
Use a level to plumb the wall jamb vertically. Temporarily fasten the wall jambs to the shower wall
with masking tape.
3. Measure and Cut the Top Track
WARNING: Risk of personal injury. Always wear safety glasses when cutting materials.
Carefully measure the distance from wall to wall at the height the top track will be installed.
IMPORTANT! For best results, use a 32-teeth hacksaw blade and a miter box to cut the top track.
Subtract 1/8" (3 mm) from the measured dimension and cut the top track to this dimension.
File the rough edges smooth where the top track was cut, taking care not to mar the finished
surface.
4. Locate the Bottom Track and Top Track
Insert the clean-outs into the ends of the bottom track
Place the bottom track assembly on the threshold between the two wall jambs and check to ensure
the bottom track is the proper length.
Kohler Co.
Clean-Out
Bottom Track
Top Track
Front Side
Side View
Secure wall
jambs with
tape.
Level
Set bottom track
between wall jambs
and check for fit.
7
Set top track on top of wall
jambs and check for fit.
1015440-2-C