Operation; Installation And Transport Of The Visulas Yag Iii - Zeizz VISULAS YAG III Instrucciones Para El Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation and transport of the VISULAS YAG III

The VISULAS YAG III will be installed and operated for the first time by
a Carl Zeiss Meditec authorised specialist. If you wish to use the
VISULAS YAG III as a mobile system, you will require the optional
transport box.
Caution
The VISULAS YAG III should be transported in the transport box
provided only.
Before transporting the instrument, the following steps should be
taken:
• Disconnect all cable connections.
• Disconnect the binocular tube from the slit lamp.
• Unscrew the screws fixing the slit lamp base to the instrument table.
• Remove the key from the key switch on the control unit.
• Adjust the slit lamp to the lowest height using the joystick.
• Unscrew the fixation lamp.
• Put all components into the cardboard boxes as shown in Fig. 15.
Reassemble the equipment in reverse order. The connections are
shown in Fig. 9.
000000-1354-664 VISULAS YAG III 15.08.2005

Operation

33

Publicidad

Tabla de contenido
loading

Productos relacionados para Zeizz VISULAS YAG III

Tabla de contenido