Kohler K-702205 Guia De Instalacion página 6

Ocultar thumbs Ver también para K-702205:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Bottom
Track
2. Install the Bottom Track
Apply a 1/4" (6 mm) bead of silicone sealant into the groove on the underside of the track.
Install the bottom track 5/8" back from the front of the bath/shower ledge with the sealant side
down, the front leg facing the outside of the shower, and an equal gap on each end between the
wall and track.
Temporarily secure the bottom track to the threshold with masking tape.
1054857-2-C
Apply
sealant.
6
Leg faces
outside of shower.
Bottom
Track
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-702207K-702209K-702217

Tabla de contenido