Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2.1 Floor Installation
a.
Connect and align middle position Repeat Floor (B) to Front Floor (A) and install Screws (AA) in nine places; keep panels aligned and
even while installing screws. Do not drill through both walls.
AA
b.
Connect and align back position Repeat Floor (B) to middle position Repeat Floor
(B) and install Screws (AA) in 9 places; keep panels aligned and even while install-
ing screws. Do not drill through both walls.
AA
HELPFUL HINT: Pilot holes may be drilled for the screws using a 1/8" drill bit.
CAUTION: Do not over-tighten screws.
HELPFUL HINT: Pilot holes may be drilled for the screws using a 1/8" drill bit.
(9)
CAUTION: Do not over-tighten screws.
(9)
A
A
7
B
B
B

Publicidad

Tabla de contenido
loading

Tabla de contenido