3.2 - INSTALLATION (see example in 3.4)
Threaded devices:
• Assemble the device by screwing it, with the due seals, onto the plant with pipes and/or fittings whose threads are consistent
with the connection being attached.
• Do not use the neck of the top cover (37) as a lever to help you screw it on, but only use the specific tool;
• The arrow, shown on the body (7) of the device, needs to be pointing towards the application;
Flanged devices:
• Assemble the device by flanging it, with the due seals, onto the plant with pipes whose flanges are consistent with the
connection being attached. The gaskets must be free from defects and must be centred between the flanges;
• If, after installing the gaskets, there is still an excessive space in between, do not try to reduce the said gap by excessively
tightening the bolts of the device;
• The arrow, shown on the body (7) of the device, needs to be pointing towards the application;
• Insert the relative washers inside the bolts in order to prevent damage to the flanges during tightening;
• When tightening, be careful not to "pinch" or damage the gasket;
• Tighten the nuts or bolts gradually, in a "cross" pattern (see the example below);
• Tighten them, first by 30%, then by 60% and finally 100% of the maximum torque (see the table below according to
EN 13611);
• Tighten each nut and bolt again clockwise at least once, until the maximum torque has been achieved uniformly;
• Common procedures (threaded and flanged devices):
• The regulator is normally positioned before the application. Previously evaluate the possibility of installing the regulator as
shown in the installation example in 3.4, namely in an optimal position pos.
• Should this not be possible, the following factors must be considered:
1. if installed as shown in pos.
2. if installed as shown in pos.
if installed in the optimal position
3. if installed as shown in pos.
regulator that protects it from debris that could enter from downstream from above (due to gravity);
a
• During installation, avoid debris or metal residues from getting into the device;
• To guarantee mechanical tension-free assembly, we recommend using compensating joints, which also adjust to the pipe's
thermal expansion;
• If the device is to be installed in a ramp, it is the installer's responsibility to provide suitable supports or correctly sized
supports, to properly hold and secure the assembly. Never, for any reason whatsoever, leave the weight of the ramp only on
the connections (threaded or flanged) of the individual devices;
• In any case, after the installation check the tightness of the system, avoiding to subject the diaphragm of the regulator
(therefore, the downstream pipe section) to a pressure higher than 300 mbar;
Madas Technical Manual - 4|4.3b - REV. 0 of 26
Diameter
Max. torque (N.m)
b
the maximum P2 or Pa value declared on the rating plate could be less by a few mbar.
c
the life span of the product could be shorter than the duration that could be obtained
a
;
, besides that indicated for pos.
d
b
c
Feb 2019
th
DN 25
DN 32
DN 40
30
50
50
a
(see figures below);
c
it is recommended to install a filter after the
13
DN 50
50
d
RG/2MB MIN - FRG/2MB MIN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Frg/2mb minRg/2mb maxFrg/2mb max

Tabla de contenido