Site Preparation - Kohler K-195 Guia De Instalacion

Ocultar thumbs Ver también para K-195:
Tabla de contenido

Publicidad

16" (40.6cm)
2x4 Stud
Framing

2. Site Preparation

- Construct suitable stud framing for wall plate.
:
NOTE
Wall plate requires special framing and support
considerations. Pay special attention to minimum and maximum
faucet height recommendations noted in the roughing in.
- Refer to roughing in dimensions on page 2 for additional
mounting information.
- A suggested framing example is shown. Each installation may have
different framing requirements than those shown.
3. Attach Wall Plate
- After confirming that framing is level and correct, secure the wall
plate using six fasteners (#10x1 Pan Head Wood Screws
recommended (not included)) to firmly secure the wall plate to the
framing.
Kohler Co.
5-5/8"
(14.3cm)
3
Wall Plate
Six Round
Holes
(Typical)
Screws
A
1016743-2-

Publicidad

Tabla de contenido
loading

Tabla de contenido