Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

OPERATION

1. TO INSTALL BATTERIES (Fig. 2)
The battery compartment holds two
"AAA" batteries.
a. Push the latch in the direction
of the arrow to release the
compartment cover.
b. Install the fresh "AAA" batteries in
their correct polarity positions, as
indicated inside the compartment.
c. Replace the battery compartment
cover.
NOTE:
• Always turn off the tool before installing or replacing the batteries.
• Remove the batteries from the tool when not using it for extended periods.
• The 2 AAA batteries should match each other in brand and type.
• Do not mix old and new batteries.
• Remove depleted batteries immediately, and dispose of them according to the
laws and regulations governing your community.
2. TO TURN THE LASER LINE LEVEL ON AND OFF
The power switch is located on the top of the tool.
a. Press the laser ON/OFF switch to turn ON the laser line level. The laser line
will be projected from the laser aperture.
b. Press the laser ON/OFF switch again to turn the laser line level off.
CAUTION: When turning on the laser line level, ALWAYS protect your eyes and
the eyes of those around you. NEVER point the laser line level at anyone's face,
including your own, and never stare at the laser line.
8
2
Latch
LASER LINE LEVEL

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido