Tools And Materials; Before You Begin - Kohler K-377 Guia De Instalacion

Ocultar thumbs Ver también para K-377:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Tools and Materials

Adjustable
Wrench
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don't
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.

Before You Begin

Observe all local plumbing and building codes.
Shut off the water supplies.
Before installation, unpack the new faucet and inspect it for
damage. Return the faucet to the carton until you are ready to
install it.
Carefully inspect waste and supply tubing for any sign of
damage and replace if necessary.
For new installations, assemble the faucet to the sink before
installing the sink.
Kohler Co. reserves the right to make revisions in the design of
faucets without notice, as specified in the Price Book.
1004636-2-E
Plumbers
Tube Cutter
Putty
2
Plus:
• Water supply
tubes or hoses
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-378K-16109K-16111K-16109-4K-377-4m

Tabla de contenido