Complete The Installation - Kohler K-1018 Guia De Instalacion

Paredes y base de ducha
Ocultar thumbs Ver también para K-1018:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

12. Apply Caulk to the Receptor and Seams
- Caulk the joints between the receptor and the walls along with the vertical joint between the two walls.
- Allow to dry according to the sealant manufacturer's instructions.

13. Complete the Installation

- Install any extra grab bars or towel bars to the bridging that was installed earlier. Follow the accessory
manufacturer's instructions.
- Install the shower door according to the manufacturer's instructions.
14. Clean-up
- Consult the care and cleaning directions in the Homeowner's guide before cleaning the unit.
- When cleaning up after installation, do not use abrasive cleansers, as they might scratch and dull the product
surface.
- Remove stubborn stains, paint, or tar with turpentine or paint thinner.
- Do not allow cleaners containing petroleum distillates to remain in contact with the product surfaces for any
length of time.
- Remove plaster by scraping the surface with a wood edge. Do not use metal or wire tools. Use a powder type
detergent on a damp cloth to provide mild abrasive action to the residual plaster.
Kohler Co.
11
A
1024937-2-

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-9455

Tabla de contenido