SMA Sunny Tripower 15000TL Instrucciones Para La Sustitución página 13

Ocultar thumbs Ver también para Sunny Tripower 15000TL:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 80
SMA Solar Technology AG
Verifying the inverter firmware version before removing the assembly
The inverter supports different firmware versions to fulfill different grid-connection requirements.
With the firmware version ≤ 2.99.99.R, the inverter fulfills the grid-connection requirements
valid until April 26, 2019 within the EU. Grid-connection requirements outside the EU are not
affected and remain valid. With the firmware version ≥ 3.00.00.R, the inverter fulfills the
European grid-connection requirements in accordance with Regulation (EU) 2016/631 for
establishing a network code (also known as RfG), valid from April 26, 2019 within the EU.
Replacement procedure in case of inverters equipped with firmware
version ≥ 3.00.00.R
The communication assembly provided is intended for installations in inverters equipped with
firmware version ≤ 2.99.99.R when leaving the factory. However, this communication
assembly can also be used in inverters equipped with firmware version ≥ 3.00.00.R. Prior to
replacement, ensure that the communication assembly is provided with an SD memory card on
which the firmware version ≥ 3.00.00.R is stored.
• Note down the country data set and if necessary differing parameter settings.
• Check the inverter firmware version.
• If the firmware version is ≥ 3.00.00.R, perform the following steps:
• Have the SD memory card with a maximum of 2 GB memory and FAT32 formatting at
the ready and create the "Update" directory on the SD memory card.
• Save the update file in the "Update" folder (update file available at www.SMA-
Solar.com).
• Insert the memory card into the slot of the new communication assembly.
• Replace the communication assembly as described below.
Disconnecting the Inverter from Voltage Sources
1. Disconnect the miniature circuit breaker from all 3 line conductors and secure against
reconnection.
2. If the multifunction relay is used, switch off any supply voltage to the load.
3. Turn the DC load-break switch to the position O.
4. Wait until the LEDs have gone out and, if necessary, the load connected to the multifunction
relay has been switched off.
5. Use a current clamp to ensure that no current is present in the DC cables.
Replacement Manual
5 Disconnecting the Inverter from Voltage Sources
SB5GCOM-STPTL30-RM-xx-10
13

Publicidad

Tabla de contenido
loading

Tabla de contenido