Cross Frame Routing Tray Installation - Leviton HDX Fiber Optic Manual De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7 CROSS FRAME ROUTING TRAY INSTALLATION

Install a Leviton HDF 3168 Cross Frame Routing Kit by following these steps:
7.1 Facing the front of the frame, install the left routing tray first (Figure 29). With the tray in
the collapsed position, place in the desired location and expand the tray until the tabs can
be positioned in the left routing slot (Figure 32) and over the center frame
body respectively.
7.2 Facing the front of the Frame, install the right routing tray first (Figure 30). With the tray in
the collapsed position, place in the desired location and expand the tray until the tabs can
be positioned in the right slot (Figure 32) and over the center frame body respectively.
7.3 Install the Front Routing Tray (Figure 31) directly in front of the right routing tray using the
provided #12/24 screws to the appropriate holes in the rack rails.
7.4 Tighten all expansion nuts prior to use.
CAUTION:
DO NOT OVERTIGHTEN.
Figure 29
Figure 30
Figure 32
38
Figure 31

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

F3168-22f

Tabla de contenido