Levolor Fabric Instalación página 7

Ocultar thumbs Ver también para Fabric:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSIDE MOUNT (IM)
STEP 1: MARKING THE BRACKET LOCATIONS
IMPORTANT: Before marking bracket locations, ensure that your bracket placement
will not interfere with any components inside the headrail.
Verify that your window casing has a minimum depth of 1
partially recessed headrail mount.
If flush mount (fully recessed mount) is desired, a minimum mounting depth of
3
" is required.
1
4
Place brackets on inside surface of valance, flush with the edge at either end.
Mark screw locations for each end bracket onto the valance, 2 holes per bracket.
STEP 2: INSTALLING THE BRACKETS
Put the valance in the window frame and using the marks, pre-drill screw holes
through the valance into the frame.
If installing brackets into wood, use supplied screws.
If installing into drywall, use anchors in combination with supplied screws.
Screw in brackets through valance into the window frame at marked locations,
2 screws per bracket.
Ensure all brackets are square with each other.
Top of
Top of
Valance
Valance
Top of
Top of
Valance
Valance
Continuous Cord Loop Lift Control–Standard Valance
Valance
Valance
Valance
Valance
Valance
INSTALLATION
" which allows for a
1
2
Top of
Top of
Valance
Valance
Top of
Top of
Valance
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

SolarRoller shades fabricRoller shades solar

Tabla de contenido