Descargar Imprimir esta página

nVent RAYCHEM E-100-L Serie Instrucciones De Instalación página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

6
• Mark the jacket
as shown.
8
• Push core sealer onto the heating
cable to the mark made in step 6.
Note: Extra force may be required
for larger cables or at lower
temperatures.
10
• Pull cable back through end seal stand until braid is just
visible above strain relief.
1 3/4 in
(44 mm)
Braid
5/8 in
(15 mm)
Make sure the bus
wires do not kink,
bunch, or crossover.
Strain
relief
7
Caution: Health Hazard. Wash hands after contact
with sealant. Consult material safety data sheet
VEN0033.
• If needed, re-twist and straighten
bus wires, then insert bus wires
into guide tubes as shown.
Make sure all strands
go into the tubes.
9
• Remove the guide tubes and
dispose of them in a plastic bag.
11
1/2 in
(13 mm)
• Trim exposed
conductors.
Tubes
nVent.com | 5

Publicidad

loading

Este manual también es adecuado para:

E-100-l1E-100-l2