Location Selection - Zoeller QWIK JON PREMIER 201 Instrucciones De Instalación

Ocultar thumbs Ver también para QWIK JON PREMIER 201:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

QWIK JON
STEP 1
Plan your new installation carefully.
Floor: The
floor
should be structurally sound and level within 1/8" (3 mm). If the
is not level, use hydraulic cement or similar material to level to the floor.
Water: A water supply will be needed to operate the toilet. Usually a 1/2" (DN15)
line with a shut-off valve is
sufficient.
Electrical: A receptacle of the appropriate voltage will be needed to supply electrical
power to the pump.
Sewage: Access to a sewage line is required. The Qwik Jon
a
1"
(DN25)
(or
3/4"
[DN20]
if
connect to an existing sewage line. A ball or gate valve should
discharge line.
Vent: Access to a vent pipe is required in some markets. The use of a mechanical
vent system is NOT recommended as the toilet will not
NOTE: If a built-in installation is to be used, locate the pump unit in an area that
will allow access to the pump and switch.
1. Always disconnect power source before attempting
to install, service, or maintain the system.
2. Never handle a pump with wet hands or when
standing on wet or damp surface or in water.
Fatal electrical shock could occur.
STEP 2
Do not use wooden shims to level the pump unit!
Ensure that nails, screws or other sharp objects do not puncture the pump unit!
Level the pump unit to within
1/8"
®
PREMIER QUICK REFERENCE GUIDE

LOCATION SELECTION

®
Premier requires
local code allows it) sewage discharge line to
be installed in the
flush.
LEVELING OF PUMP UNIT
(3 mm)
using hydraulic cement or similar material.
© Copyright 2020 Zoeller Co. All rights reserved.
floor
OUTLET
QWIK JON
MODEL 201
- 5 -
VENT
DISCHARGE
PIPE
PIPE
BALL OR GATE VALVE
SOLD SEPARATELY
WATER
SUPPLY
LEVEL FLOOR
PREMIER
®
SK2588

Publicidad

Tabla de contenido
loading

Tabla de contenido