Location Selection - Zoeller QWIK JON CHOICE 200 Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

QWIK JON
STEP 1
Plan your new installation carefully.
Floor: The
floor
should be structurally sound and level within 1/8" (3 mm). If the
is not level, use hydraulic cement or similar material to level to the floor.
Water: A water supply will be needed to operate the toilet. Usually a 1/2" (DN15)
line with a shut-off valve is
sufficient.
Electrical: A receptacle of the appropriate voltage will be needed to supply electrical
power to the pump.
Sewage: Access to a sewage line is required. The Qwik Jon
a
1"
(DN25)
(or
3/4"
[DN20]
if
connect to an existing sewage line. A ball or gate valve should
discharge line.
Vent: Access to a vent pipe is required in some markets. The use of a mechanical
vent system is NOT recommended as the toilet will not
NOTE: If a built-in installation is to be used, locate the pump unit in an area that
will allow access to the pump and switch.
STEP 2
Do not use wooden shims to level the pump unit!
Ensure that nails, screws or other sharp objects do not puncture the pump unit!
Level the pump unit to within
1/8"
®
CHOICE QUICK REFERENCE GUIDE

LOCATION SELECTION

®
Choice requires
local code allows it) sewage discharge line to
be installed in the
flush.
LEVELING OF PUMP UNIT
(3 mm)
using hydraulic cement or similar material.
© Copyright 2022 Zoeller
floor
OUTLET
QWIK JON
MODEL 200
1. Always disconnect power source before attempting
to install, service, or maintain the system.
2. Never handle a pump with wet hands or when
standing on wet or damp surface or in water.
Fatal electrical shock could occur.
®
Co. All rights reserved.
- 5 -
VENT
DISCHARGE
PIPE
PIPE
BALL OR GATE VALVE
SOLD SEPARATELY
WATER
SUPPLY
LEVEL FLOOR
CHOICE
®
SK2588

Publicidad

Tabla de contenido
loading

Tabla de contenido