ABB ACH580 Guía Rápida De Puesta En Marcha página 9

Ocultar thumbs Ver también para ACH580:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23
Press the Hand key
Check the direction of the motor.
If it is forward, select Yes, motor is spinning forward and
press
(Next) to continue.
If the direction is not forward, select No, fix direction and
press
(Next) to continue.
The first start is now complete and the drive is ready for use.
Press
(Done) to enter the Home view.
The Home view monitoring the values of the selected signals
is shown on the panel.
You can complete the commissioning in five different ways:
1. Start using the drive with no further adjustment:
Press the Hand key
panel.
2. Assistant commissioning:
Go to Menu → Primary settings → Start, stop reference and complete the two
assistants. For more details see the firmware manual.
3. HVAC quick commissioning:
Go to Menu → Primary settings → HVAC quick setup. Go through the items on the
menu. This option is instructed in the rows below.
4. Commissioning with Primary settings:
Hand
on the panel to start the drive.
on the panel to start the motor, and set the reference on the
Hand
EN – Quick start-up guide 9
EN
DE
ES
FI
FR
IT
NL
PT
RU
SV

Publicidad

Tabla de contenido
loading

Tabla de contenido