performed in accordance to the power absorbed by the cabinet (see Technical Data).
Remove all metallic objects worn: rings, watches, bracelets, earrings, etc.
Consult the wiring diagrams before performing the connection.
Check that power supply voltage is the one reported on the rating plate.
Instruct the operator on the position of the switch so that it may be timely reached
in case of an EMERGENCY.
To ensure normal operation, the maximum variation of the voltage must range
between +/- 6% of the nominal value.
Check that the power supply line has wires with an appropriate diameter, that it is
protected against overcurrents, and that the leakages to ground are in compliance
to the norms in force.
If the electrical power supply is interrupted, check that all the electrical devices of
the store can restart without triggering the intervention of the overload protections;
on the contrary, modify the system so as to differentiate activation of the various
devices.
If the power supply cable is faulty or ruined, it must be replaced by the
manufacturer or authority chosen by the same.
The installer must provide the anchoring devices for all the wires in input and output to/
from the cabinet.
Prevent the casing from making contact with the electrical panel to avoid
electrical shocks that can cause injuries or death.
Check that the connections of the various lighting devices (floors, roof,
superstructure) are properly inserted and locked into their respective sockets,
so as to prevent disconnections during cleaning and maintenance operations
that may cause electrical shocks harmful to the operator.
The automatic magneto-thermal switch must be such that it does not open the circuit
on the neutral, without simultaneously opening on the phases and, at any rate, the
distance between the opening of the contacts must be at least 3 mm.
13.Position of the probes (Rif. 24) - specialized technician -
The probes are already assembled in the cabinet and are:
Sout Air inlet control probe
Sdef Defrost end thermal switch control probe
Sin
Suction air control probe
Temperature probe: NTC IP67 L=4000 code 04510153.
The Sout - Sin probes must be blocked with terminals and must not be insulated.
The Sdef probe must be fixed in contact with the evaporator fins between the 3rd
and 4th pipe (never close to the fan) using the stainless steel bulb stop spring code
02230021.
14. Start, control, and adjustment of the temperature
- specialized technician -
The refrigeration temperature is controlled on the digital thermometer (Rif. 11) or with
the electronic controller (OPTIONAL) (Rif. 12).
Normally, the controller is programmed in the factory during the testing phase; in case
the programmed setting is changed, refer to the instructions provided by the
manufacturer of the controller.
15.Loading the cabinet - qualified operator -
To stock up the cabinet, certain important rules must be followed:
arrange the goods so that the maximum load line is never exceeded (Rif. 19); to
exceed this limit means to disturb correct air circulation (Rif. 18) causing the
temperature of the goods to rise and the formation of ice on the evaporator;
Arrangement of the goods without empty spots ensures better operation of the
cabinet.
05060138 00 05/02/2013
Ankara Twin - Mini Ankara Twin
English
29