Water Ace R1030 Manual Del Usuario página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

IMPORTANT: To prevent leaks, be sure that the cleats on the
corners of the basin gasket are up with the cover upside down
(that is, not pressed into the sealing face of the cover).
Step 7 (See Figure 5)
Push the screws with their washers installed up through the
holes in the rim of the cover and in the basin gasket (the
cover will retain the screws).
Step 8 (See Figure 6)
• Align the cover with the discharge pipe and cords.
• Pull the cords through the non-threaded hole in the basin
cover.
• Place the cover over the discharge pipe.
• Install the cords in the cord grommet
• Install the cord/grommet assembly in the non-threaded
hole in the basin cover; don't pull the cords tight.
1
1 " NPT
2
Discharge
Discharge
Figure 6
Step 9 (See Figure 6)
Fasten the basin cover to the basin with the capscrews previ-
ously inserted in the cover (Step 7).
IMPORTANT: To prevent leaks, be sure the locating cleats on
the corners of the basin gasket are outside the edges of the
basin rim, not pressing against the rim.
WA483
1
1 " NPT
2
Vent
Cord Grommet
Inlet
Pump
4720 1004
INSTALLATION (SEE FIGURE 7)
The basin (system) should be located at the lowest place pos-
sible relative to the area to be drained.
NOTE: Make sure that the inlet of the pre-plumbed system is
lower than the water to be pumped.
Thread pipes into fittings;
don't go past end of threads.
1
1 " NPT
2
Vent
1 /
15
8
1/3 HP
Pump
12"
Figure 7 – Drainer Pre-Plumbed System Dimensions
1. Install inlet pipe in opening as shown. Use RTV sealants or
Plasto-Joint Stik* to seal threads. See Figures 8, 9, and
10, page 4 and 5, for typical installation arrangements.
Discharge
Pump
Figure 8 – Typical installation to remove air conditioner
condensate or dehumidifier water
*Lake Chemical Co., Chicago, Illinois
4
1
1 " NPT
2
Discharge
"
1
1 " NPT
2
Inlet
13
12"
Vertical Float Switch
Vent
3 /
"
4

Publicidad

Tabla de contenido
loading

Tabla de contenido