Quick Installation - Tripp-Lite SmartPro SMART750XLA El Manual Del Propietario

Ocultar thumbs Ver también para SmartPro SMART750XLA:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Quick Installation

Note: The illustrations may differ somewhat from your model.
1
(Select Models) With the UPS
disconnected from utility power, use
a small tool to set the Voltage Dip
Switch to match your input voltage.
(All models are preset to the 120V
setting.)
2
Plug the UPS into an outlet on a
dedicated circuit.
NOTE! after you plug the UPS into a live AC outlet, the
UPS will automatically charge its batteries,* but will not
supply power to its outlets until it is turned ON.
* The BATTERY CHARGE LED will be the only LED
illuminated
3
Plug your equipment into the UPS.
Note: Your UPS is designed to support electronic
equipment only. You will overload the UPS if the total VA
rating for all equipment connected exceeds the UPS
Output Capacity. To find your equipment's VA ratings, look
on the nameplates. If the equipment is listed in amps,
multiply the number of amps by 120 to determine VA.
(Example: 1 amp × 120 = 120 VA). If you are unsure if
you have overloaded the UPS, see "OUTPUT LOAD LEVEL "
LED description.
4
Turn the UPS ON.
Press and hold the "STANDBY" button
second. The alarm will beep once briefly after one
second has passed. Release the button.
14-12-047-932773.indb 3
1
2
3
A
for one
A
4
3
12/17/2014 4:31:24 PM

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Agsm6955

Tabla de contenido