4.
COOLANT REFILLING PROCESS
1. After purge process there will be vacuum force remains in the cooling system.
2. Top up coolant via "suction hose" by vacuum force remains in the system. Open the valve in
"suction hose" side of the device to start the process.
3. After refill process, disconnect assembling and check the coolant level. Add in coolant manually if
necessary.
8.
BGS technic KG
Bandwirkerstr. 3
D-42929 Wermelskirchen
5.
7.
9.
Tel.: 02196 720480
Fax.: 02196 7204820
mail@bgs-technic.de
6.
10.
www.bgstechnic.com
© BGS technic KG, Copying and further use not allowed