Seca 240 Manual De Instrucciones Y Garantía página 9

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23
3. Before you start...
Unpacking
Remove the packaging.
The scope of supply includes:
• measuring rod, bottom part
• measuring rod, top part, with head stop
• heel plate
• 5 mounting screws
• 5 rawlplugs
• 20 spacers
• 2 cylindrical bolts (plastic) and nuts
• 1 bag containing a pan-head tapping
screw
• 1 set of operating instructions
Assembly
– Select a location for attaching the measuring rod where the floor is level and unyielding.
In order to avoid damage to the measuring rod during use, the heel plate must
be supported against the wall. The number of spacers used determines the dis-
tance of the measuring rod from the wall. You need to use at least one spacer for
each of the two mounting points.
– Place the spacers on top of one another
and screw them to the heel plate using
the plastic nuts and bolts.
Alternatively..
Model 240
9
GB

Publicidad

Tabla de contenido
loading

Tabla de contenido