US
Read installation and operating instructions in
their entirety before installing the double regulating and
commissioning valve
Installation, initial operation, service and maintenance
must only be carried out by qualified tradesmen
The installation and operating instructions, as well as
other valid documents must remain with the user of the
system
Content:
1. General information........................................................ 1
2. Safety notes ................................................................... 1
6. Installation ...................................................................... 4
7. Operation........................................................................ 4
8. Accessories ................................................................... 4
9. Maintenance................................................................... 4
10. Warranty ......................................................................... 4
Illus.1 Combined control and regulating valve "Cocon QTR"
1 General information
1.1 Information regarding installation and operating
instructions
These installation and operating instructions serve the
installer to install the combined control and regulating valve
professionally and to put it into operation.
Other valid documents - manuals of all system components
as well as valid technical rules - must be observed.
1.2. Keeping of documents
These installation and operating instructions should be kept
by the user of the system.
Oventrop Corp.
P.O. Box 789
29 Kripes Road
East Granby, CT 06026
Phone (860) 413 91 73
Telefax (860) 413 94 36
E-Mail usa@oventrop.com
Internet www.oventrop-na.com
Subject to technical modification without notice.
166611280 12/2011
Valves, controls + systems
Combined control and regulating valve
Installation and operating instructions for the specialized installer
1.3 Copyright
The installation and operating instructions are copyrighted.
1.4 Symbol explanation
Safety guidelines are displayed by symbols. These guide-
lines are to be observed to avoid accidents, damage to
property and malfunctions.
2 Safety notes
2.1 Correct use
Safety in operation is only guaranteed if the valve is used
correctly.
The combined control and regulating valve "Cocon QTR" is
designed to be installed in heating and cooling systems with
a closed water circuit (e.g. central or underfloor heating sys-
tems, fan coil units, chilled ceilings, fan convectors etc.).
It operates as an automatic flow and differential pressure
independent control (hydronic balancing) and can control
another variable (e.g. room thermostat) by modifying the
flow rate in conjunction with actuators.
Any use of the "Cocon QTR" outside of the above applica-
tions will be considered as non-compliant and misuse.
Claims of any kind against the manufacturer and/or his
authorised representatives due to damages caused by
incorrect use cannot be accepted.
The observance of the installation and operating instructions
is part of the compliance terms.
2.2 Possible dangers at the installation location
The case of an external fire has not been taken into consi-
deration when constructing the valve.
"Cocon QTR"