Maintenance; Safety Warnings For Maintenance; Cleaning - Ravelli HR EVO 300 SMART Manual De Uso Y Mantenimiento

Ocultar thumbs Ver también para HR EVO 300 SMART:
Tabla de contenido

Publicidad

EN
Rev.1 08/09/2021
Pag.52

MAINTENANCE

Safety warnings for maintenance

Maintenance of the boiler must be performed at least once a year and should be planned in advance with the Technical
Assistance Service.
Dispose of cleaning waste in accordance with the current local regulations
In some conditions, such as turning the boiler on and off or inappropriate use, the combustion products can contain small
soot particles that build up in the smoke evacuation system. This can reduce the cross-section of the smoke duct and pose
a fire risk. The smoke evacuation system must be inspected and cleaned at least once a year.
The maintenance operations must be carried out when the boiler is cold and with the electrical power supply disconnected.
Before completing any maintenance operation, adopt the following precautions:
Make sure that all boiler parts are cold.
Make sure that the ashes are completely cold.
Always operate with equipment that is appropriate for maintenance.
When maintenance is finished, re-install all of the dis-assembled parts before restarting operation.
��
The quality of the pellet, the boiler operating mode and combustion control can affect maintenance activity frequency.

Cleaning

��
Perform the cleaning operations so as to guarantee correct boiler operation.
Boiler cleaning is very important to prevent: poor combustion, deposits of ash and unburnt products in the brazier, reduced thermal
efficiency.
The table below lists the necessary cleaning operations required for correct stove operation.
��
It is recommended in the early periods of use of the boiler, or of a new type of pellet, to carry out cleaning operations
frequently, so as to be able to assess the exact frequency of intervention.
Cleaning the ash drawer
The ash drawer must be cleaned every
30 days, (depending on the amount of
time the boiler is used and what type of
pellet is used).
To clean the ash drawer, proceed as fol-
lows.
Use and maintenance manual HR EVO Smart
PARTS / FREQUENCY
Ash drawer
Glass
Turbulators
Combustion chamber
Pellet tank
Extraction duct
1
2-3 DAYS
30 DAYS
60/90 DAYS
2

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hr evo 350 smart

Tabla de contenido