Device description MISTRAL PREMIUM; SYSTEM
12
11
10
5
6
8
Preparation MISTRAL PREMIUM; SYSTEM
• Remove MISTRAL from the packaging.
• Open the connection housing cover (2) by loosening the screws (3).
• Loosening the cable gland for mains connection (5).
• As required loosen the cable gland for interface (6).
Installation
• The device may only be installed by trained personnel.
• The installation must ensure that
– only cold air is supplied..
– no excess (heat) residue builds up.
– the device is not subject to jets of hot air from another device.
• Protect the MISTRAL from mechanical vibrations and shocks.
• Fasten the device on the mounting points (1) using four screws Ø M4.
• For installation dimensions, see pages 3 (Size).
Air supply
• The integrated blower serves as an air supply.
• In order to protect the device and heating element, the specifi ed minimum air volume must never fall below the
minimum level. and the maximum temperature (hottest point measured 3 mm in front of the heating element
tube) must never be exceeded (see technical specifi cations). If the minimum air volume is not maintained then
the heat output must be interrupted immeadiatly.
3 (4 ×)
2
9
1 (4 ×)
Attention: always operate device with air supply !
MISTRAL PREMIUM; SYSTEM
1 Mounting points
2 Connection and housing cover
3 Screws for connection housing
4 Heating element tube
5 Cable gland for mains connection
6 Cable gland for interface
7 Air inlet fl ange with inner thread G 1"
8 Connector ø 38 for
air hose or
4
9 Housing cover
MISTRAL PREMIUM
10 Potentiometer for setting heating power
MISTRAL SYSTEM
11 e-Drive for temperature / air setting
12 Display
stainless steel fi lter
23