Kohler K-7202 Guia De Instalacion página 4

Ocultar thumbs Ver también para K-7202:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Apply
Plumbers Putty
Overflow Seal
Overflow Body
Ensure that overflow pipe is
vertical and tee is square to
bath overflow and waste
Ensure that waste
pipe is horizontal
2. Install Overflow
- Remove the overflow seal from the packaging and position it on top
of the overflow body. Apply Plumbers Putty or other sealant to the
top edge of the overflow seal, according to the putty manufacturer's
instuctions.
- Align the overflow body to the bath overflow and the waste body to
the bath waste. The tee should be square to both the bath overflow
and waste body.
- Remove the back plate and overflow ferrule from the packaging.
- Ensure the overflow is positioned properly to the bath. Position the
back plate on the top of the bath and hand tighten with the ferrule.
Do not fully tighten at this time.
3. Install Waste
- Remove the waste seal, waste flange, and ferrule from the
packaging.
- Apply Plumbers Putty or other sealant to the middle (vertical) area
of the waste seal, according to the putty manufacturer's instuction's.
Position the waste seal into the bath waste from the underside of the
bath. The smaller diameter of the seal will be visible from the top of
the bath.
- Locate the waste body beneath the bath. Position the waste flange
into the bath from above and hand tighten the ferrule into the waste
body. Do not fully tighten at this time.
C
1013265-2-
Control Knob
Overflow Ferrule
Back Plate
Overflow Pipe
Tee
4
Bath
Plug
Waste Ferrule
Waste Flange
Waste Seal Apply
Plumbers Putty
Waste Body
Waste Pipe
Tailpiece
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido