STEP 3
To sync two bases with SmartSync™ cord, see installation
instructions in Owner's Manual
Uncoil Power Down Box from frame and
place box on the ground. Ensure that it is
easily accessible when base is turned to its
upright position.
STEP 4
Uncoil input cord (connected to
control box's power port) and plug it
into Power Supply.
STEP 5
Uncoil Power Cord and connect to
Power Supply. Place Power Supply on
ground and extend from base. Ensure
that Power Supply and all attached
cords are directed toward the desired
surge protector.
STEP 6
Carefully flip the base over onto its legs.
Important: Two people are required to move the bed base.
Do not drag frame across the floor or rest frame on its side, as
excessive pressure may damage the legs.
STEP 7
Plug the base and into a power source. A surge protector is
strongly recommended.
STEP 8
Install (3) AAA batteries in remote control.
Quickly test functions before placing mattress
on base to verify proper setup.
Press FLAT to return base to a flat position.
STEP 9
Locate the mattress retainer bar slots. at
the foot of the base.
Insert the left end of the mattress
retainer bar into the left slot, then insert
the other end into the right slot to
secure the bar.
Setup is now complete! Test all functions on remote to ensure
proper setup. For more information please see Owner's Manual
For customer support, visit www.ergomotion.com
REMOTE GUIDE
or call: 1-888-550-3746
ADJUST
Lift and lower head section of base.
ONE TOUCH
One touch ZERO-G
preset position.
®
ZERO-G
adjusts your legs to a higher level
®
than your heart helping to relieve pressure off
lower back and promote circulation.
FLAT preset position.