Maintenance Instructions - Fantech PBF Serie Manual De Instalación Y Mantenimiento

Ocultar thumbs Ver también para PBF Serie:
Tabla de contenido

Publicidad

6
Installation of Ceiling Grille Housing With
or Without Light
1. Plan Location of Inlet Grilles
Based on the bathroom layout and fixtures, plan the location of the ceil-
ing grilles for the most effective ventilation.
2. Securing the Housing to the Ceiling Joists
NEW CONSTRUCTION
Mount housing directly to the ceiling joist using screws and keyhole
slots. Locator tabs on housing should be flush with the bottom edge of
the ceiling joist for correct positioning of the unit once drywall is
installed (Figure 1).
OR
Use the hanger bars to suspend the housing between ceiling joists. For
correct positioning, hanger bars should be positioned 3 / 16 " up from the
bottom edge of the ceiling joist on models with 4" duct connection and
15 /
32 " up from bottom edge of joist on models with 6" duct connection.
On models with 4" duct, tighten anti-slide screws to keep hanger bars in
place. (Figure 2).
Note: Hanger bars on units with 4" duct connection can be used on ceil-
ing joists up to 24" on center. Hanger bars on units with 6" duct connec-
tion span ceiling joists up to 16" on center.
Note: If drywall or ceiling material is thicker than 5 /8" the locator tabs
may be removed to allow the grille collar to be flush with the finished
ceiling material. When ceiling drywall is being installed, cut hole for ceil-
ing grille.
EXISTING CONSTRUCTION OR WHEN DRYWALL IS IN PLACE.
Cut a 6" round hole for the ceiling grille only and install the housing from
the attic (Figure 3). Place the housing against the ceiling joist using the
locator tabs to determine the correct position (Figure 1) or align it using
the hanger bars (Figure 2). Punch out the keyhole knockouts (if using)
and the electrical knockout if needed. To complete installation for Bath
Fan models with lights, continue with steps 3 through 5. For models
without lights, skip to steps 4 and 5.
3. Make Electrical Connections to the Ceiling Grille Housing.
Remove the electrical cover inside the steel housing using a screwdriver.
Connect power by following wiring diagram (Figure 4) and following local
or National Electrical Codes. Replace the electrical cover.
4. Connect the Fan to the Ceiling Grille Housing(s).
Install appropriate diameter duct from the fan to the ceiling grille housing.
(Insulated flexible duct is recommended for all Fantech bathroom exhaust
applications for quieter operation.) For dual grille models, install duct
between fan and wye adapter* (included). Then, attach duct to each leg of
the wye and to each ceiling grille housing. Secure duct in place and seal. If
using insulated flexible duct, seal the inner liner to the duct connector then
seal the outer shell over the top of the inner liner. Do not leave the insula-
tion material exposed.
5. Installing the Bulb.
Install the bulb by gently inserting it into the socket in the grille housing.
Install the grille by pushing it firmly into the steel collar until it is shoul-
dered by the ceiling drywall (Figure 3).
Repeat steps 1 through 5 for each additional ceiling grille housing being
installed.
* For most efficient operation wye adapter should be positioned
the equivalent of three duct diameters away from the fan inlet.
fantech
Figure 1
Postion Locator Tabs
flush with bottom
edge of joist
Figure 2
Housings with 4"
duct:
3
/
" from
16
Anti-slide
bottom edge of
locking screw
joist.
on models with
Housings with 6"
4" duct.
duct:
/
"
15
32
Figure 3
LED
lamp
SCALE 3/10
Grille
Electrical
Figure 4
DIMENSIONS
Housing Dimensions of 4" duct models
9
/
" (243mm)
9
16
7
/
" (182.5mm)
3
16
5
/
" (148mm)
13
16
8
15
/
" (227mm)
16
All dimensions are in inches and mm.
TROUBLESHOOTING
If fan fails to operate, please check the following:
1. Consult wiring diagrams (above) to ensure proper connection.
2. Check motor lead wiring, capacitor leads and incoming supply leads to
insure definite contact.
3. If possible, use a meter to test for continuity across the fan motor
leads. In order to do this, the capacitor must be disconnected (do notT
test the capacitor - it will not meter continuity). If motor leads show
continuity, consult factory for a replacement capacitor.

Maintenance Instructions

Since fan bearings are sealed and provided with an internal lubricating
material, no additional lubrication is necessary.
Housing Dimensions of 6" duct models
9
11
/
" (246mm)
16
8" (205mm)
5
1
/
" (148mm)
16
9" (230mm)
fantech
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pb110l744942

Tabla de contenido