Kohler Vanity 33562-0 Instrucciones De Instalación página 5

Tocador
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. Install the Vanity
34-1/2"
(876 mm)
CAUTION: Risk of personal injury or property damage. Select 500 lb (227 kg) load bearing 5/16" lag bolts with a
length to clear obstacles in the wall and 5/16" washers. Calculate the proper lag bolt length by adding the following:
1-1/2" (38 mm) backing material, plus the wallboard thickness, plus the back rail thickness.
CAUTION: Risk of product damage. Drill the lag bolt pilot holes in the ends of the back rail to provide maximum
support and to prevent flexing of the unit.
Create temporary support framing that spans the width of the vanity and will set the top of the vanity 34-1/2" (876
mm) from the finished floor.
Vanity with legs: Install the leg assembly. Refer to the instructions packed with the legs.
With help, lift and place the vanity in position against the finished wall.
Verify that the vanity is level and plumb against the wall.
Wall-hung vanity: Place shims under the temporary support to adjust the unit as needed.
Vanity with legs: Turn the levelers to adjust the unit as needed.
Using a 1/4" drill bit, drill a pilot hole through each end of the back rail and into the finished wall. Verify that the holes
align with the 2x6 bracing or a wall stud.
Drill a pilot hole at each stud location between the two end holes.
Secure the vanity to the wall with 5/16" lag bolts and washers (not provided). The lag bolts should engage the 2x6
bracing or a wall stud.
Remove and discard the temporary support framing once the vanity is properly installed.
Install drawer pulls and optional accessories as desired. Refer to the instructions packed with the accessories.
Kohler Co.
Support
Framing
5
2x6 Bracing
Leveler
1470606-2-A

Publicidad

Tabla de contenido
loading

Tabla de contenido