2. CARRYING BOX INSTALLATION
2.1. The hole which contains the carrying box must have the
approximate dimensions mentioned in Fig. 4.
For a correct placing, it is obbligatory to follow closely the
quote of 47 mm which corresponds to the minimum distance of
the rotation axis from the pillar.
dimensions (mm)
2.2. Inside the excavated pit you have to plan:
rain water drainage;
a water waste pipe in PVC of about 40 mm of diameter to
put inside the provided hole of the box before it is concreted
(Fig. 5). It must be brought until the drain of the sewer
line;
a sheath for the passage of electrical cables of about 20
mm of diameter which must be brought to the proximity of
the electric connection box (Fig. 5).
10
cod. 67410630
®
Fig. 3
Mechanical stop
in closing
Fig. 4
Rev 12 - 03/2011
Fig. 5
2.3. Before concreting the carrying box, use a level to make it
perfectly horizontal to the ground (Fig. 6) and perpendicular to
the axis of the gate (Fig. 7).
The axis of the upper hinge of the gate must correspond
exactly to the axis of the carrying box shaft.
Follow the distance of 64 mm closely between the carrying
box cover and the base of the gate.
Fig. 6
Fig. 7
2.4. Insert the ball into the perforated shaft (Fig. 8)
ENGLISH
Electric
connection box
Sheath for electric
cables passage
PVC tube
water discharge
Fig. 8