6. SECURE BASE FEET:
A. Depending on the model purchased, your base feet will
either fit onto the outside of the leg pole, or slide into the
bottom of the leg pole.
B. After installing the base feet, line up the holes in the leg to
the holes in the feet and secure with the hardware indicated
in Detail G.
7. INSTALL AUGER ANCHORS:
A. Anchors must be placed inside shelter. Start at the corners
of the shelter. insert a ¾" pipe or steel rod, through the eyelet
of the auger and screw the anchor into the ground. (if ground is
too hard, dig a hole with a shovel or post hole tool.)
OPTIONAL: Fill with cement.
B. Space out the remaining anchors evenly along the length of
the shelter. Screw the anchor into the ground until the eyelet is
sticking out of the ground by 1-2" so it can be anchored to the
legs.
C. Wrap the cable provided through the eyelet of the anchor
and around the frame as indicated in Detail H. Secure the cable
with the clamps provided.
D. Repeat for middle legs by attaching cable around foot plates.
8. zIPPER DOOR AND OR END PANEL INSTALLATION:
A. Hold the end panel at the top center with the white inner
surface facing the inside of the shelter (if you have a white
shelter the inner surface has the visible weld seams).
B. Unscrew top rail from the top bend and place the webbing
in between. The top rail should pass through the loop of the
webbing. Reconnect top rail onto rib and secure it with the
screws indicated. See Detail i.
C. Remove the nut from the side rail and carefully pull
the side rail away from the ShelterLock
™
(pull away only
enough to pass the webbing through the connection). If
this connection has the wind brace on it remove the
wind brace end before pulling the side rail. Replace the
cross rail and wind brace. See Detail j. Replace the nut and
tighten. Repeat this on the other side.
D. At the bottom, where the webbing exits the pocket on
each side of end panel, pull webbing to remove the slack.
Be careful not to pull the webbing through the other side of
the panel.
e. install the "S"- hook from the ratchet into the leg of the
shelter. insert the webbing into the spindle of the ratchet
and pull tight. See Detail j. Wind the ratchet so that the web-
bing overlaps itself. Repeat this process on the other side of
the panel. Position the end panel so that it is centered on the
building.
f. Tighten the ratchets, alternating from one side to the other,
until the end panel is tight. Repeat these steps on the other
end of the building.
05-201133_13-0D
DETAIL G
01010
10114
DETAIL H
Slits
Slit in fabric
folded around
frame and
cross rails
inserted
through slits
INSIDE vIEw
DETAIL I
DETAIL J
Page 8
9. INSTALLING THE COVER ON THE FRAME:
A. Lay the cover on the ground next to the
frame with the inside of the cover (the side with
the pipe pockets) facing down and the webbing
Secure
on the front and rear of the corner of the build-
with bolt
ing. Position the cover so that it is centered on
and nut
the frame, front to back. See Detail K.
B. fold over the side so the pipe pocket is now
accessible. insert a cover pipe into the pipe
pocket slot, at the first middle rib from the front
and the first middle rib from the rear. Some of
the pipe will be exposed. for long buildings it
may be necessary to use additional pipes in the
middle. See Detail L. Remove pocket pipe to
install later.
C. Tie the rope on each of the exposed pipes
and throw the other end of the rope over the
frame. See Detail M.
D. Move to the other side of the frame and pull
the cover over the frame with the rope. This
may require two or more people. See Detail N.
Check that the Logo reads upright as shown.
SIDE vIEw
DETAIL M
DETAIL K
DETAIL L
DETAIL N
Page 9
END PANELS
NOT SHOwN
FOR CLARITY
05-201133_13-0D