Electrical Installation; Indication Of Operating State - Siemens RLM162 Instrucciones De Montaje

Ocultar thumbs Ver también para RLM162:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 13
• As a supply air temperature controller:
In the supply air duct downstream from the supply air
fan if fan is installed after the last air handling unit,
otherwise
In the supply air duct downstream from the last air
handling unit in a distance of 0.5 m
• As a minimum supply air temperature limiter:
In the supply air duct as close as possible to the air dis-
charge into the room
• As a dewpoint controller:
Immediately downstream from the droplet separator of
the air washer
Mounting
Procedure:
1.
First mount the flange. For drilling holes, refer to "Di-
mensions".
2.
Bend flexible sensing element manually (never use a
tool) so that – when mounted – it stretches diagonally
across the air duct .
Note! The flexible sensing element may not touch the
duct wall: The minimum clearance is 50 mm and the
smallest permissible bending radius 10 mm
3.
Fit mounting flange.
4.
Slide controller on mounting flange and snap it on.

Electrical installation

• Ensure that the local regulations for electrical installa-
tions are complied with
• The connecting terminals are located under the flexible
plastic cover
• Make wiring according to the plant documentation. If not
available, use the connection diagrams contained in
these Installation Instructions
• Observe the permissible cable lengths
• Switch on power only when commissioning the controller
Settings
2
3
1
1
LED for test mode / normal operation
2
DIP switch block
3
Setting slider for setpoint increase or decrease
4
Setting potentiometer for the relay Q13–Q14
5
Setting potentiometer for the P-band
5
Temperature setting slider for setpoint or limit value
Siemens Building Technologies
All manuals and user guides at all-guides.com
4
5
6
CE1G3332xx
Operating action:
Where?
What?
DIP switch block,
1
2
switches no. 1 and 2
Heating and cooling in sequence
Two-stage heating
Single-stage cooling
Single-stage heating
Control mode and integral action time:
DIP switch block,
3
4
switches no. 3 and 4
P-mode
PI mode, integral action time = 600 s
(SLOW)
PI mode, integral action time = 120 s
(FAST)
PI mode, integral action time = 180 s
(MEDIUM)
Test mode:
DIP switch block,
5
switch no. 5
Test mode
Normal operation
Outside temperature compensation:
DIP switch block,
6
switch no. 6
HIGH
LOW
Switching contact Q13–Q14:
Potentiometer 4
Potentiometer setting should correspond to the re-
quired switching point of output relay Q13–Q14
P-band Y1 (not adjustable for Y2):
Potentiometer 5
Potentiometer setting should correspond to the re-
quired range of the controller's output signal
Setpoint increase / decrease:
Slider 3
Setpoint or limit value (supply or extract air temp.):
Temperature setting
Adjust after commissioning
slider 6

Indication of operating state

The red LED indicates the controller's operating state:
• LED lit: Mains voltage present
• LED flashes: In test mode
The LED is also visible when the cover is fitted.
Commissioning
When used as a controller
1.
Remove housing cover.
2.
Lift flexible plastic cover so that you can access the
setting elements.
3.
Make the settings:
Operating action (DIP switches 1 and 2)
Control mode and (with PI mode) integral action
time (DIP switches 3 and 4)
07.01.2008
3/20

Publicidad

Tabla de contenido
loading

Tabla de contenido