Descargar Imprimir esta página

Ferroli ENERGY TOP B Instrucciones De Uso, Instalación Y Mantenimiento página 61

Ocultar thumbs Ver también para ENERGY TOP B:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21
80
80
125
80
125
125
160
160
250
160
250
250
160
160
160
160
250
160
250
160
250
250
250
250
160
160
250
160
250
250
250
250
250
250
250
250
250
250
250
250
250
250
A
1
B
Model
Model
Safety devices and separator module
The generator can be installed directly outside or in a suitable room with ventilation open-
ings to the outside as prescribed by the current regulations. If there are several burners
or extraction units that can work together in the same room, the ventilation openings
must be sized for simultaneous operation of all the units. The place of installation must
be free of flammable objects or materials, corrosive gases, volatile substances or dusts.
For positioning, leave enough space around the modules for normal maintenance oper-
ations. Make sure the front door opens without hindrance.
B
The air necessary for combustion enters through special openings in the bot-
tom and top part of the unit. Make sure these air passages are not obstructed
in any way.
All manuals and user guides at all-guides.com
/
/
/
200
500
/
/
/
200
500
/
/
/
200
500
/
/
/
200
1000
/
/
/
200
1000
/
/
/
200
1000
80
/
/
200
1500
125
/
/
200
1500
80
/
/
200
1500
125
/
/
300
1500
80
/
/
300
1500
125
/
/
300
1500
160
160
/
300
2000
160
160
/
300
2000
160
160
/
300
2000
250
160
/
300
2000
250
250
/
300
2000
250
250
80
300
2500
250
250
125
300
2500
250
250
160
300
3000
250
250
250
300
3000
4
4
2
cod. 3540S736 - Rev. 00 - 09/2013
Make the relevant connections according to the instructions given below. Make the gen-
erator connection in such a way that its internal pipes are free of stress. For proper op-
eration and long life of the generator, the plumbing system must be of suitable size and
complete with all the accessories that guarantee regular operation and running.
In particular, provide for all the protection and safety devices prescribed by current reg-
ulations for the complete modular generator. They must be installed on the hot water cir-
cuit delivery piping, immediately downstream of the last module, within a distance of 0.5
m, with no shut-off devices in between. A "Safety Device and Circuit Breaker module"
equipped with internal hydraulic circuit breaker and safety units with ISPESL certification
is available by request. Refer to the price-list or contact our sales network. The unit is not
supplied with an expansion tank; its connection must therefore be made by the Installer.
B
A filter must also be installed on the system return piping to prevent impurities
or sludge from the system clogging and damaging the heat generators.
The filter must necessarily be installed when replacing generators in existing
systems. The manufacturer declines any liability for damage caused to the gen-
erator by failure to install or inadequate installation of this filter.
In the presence of water harder than 25° Fr, it is advisable to use suitably treated water,
in order to avoid possible scaling in the boiler caused by hard water, or corrosion pro-
duced by aggressive water. Due to its low thermal conductivity, scaling even just a few
mm thick causes significant overheating of the generator walls, with consequent serious
problems.
Water treatment is indispensable in case of very large systems (containing large
amounts of water) or with frequent introduction of replenishing water in the system. If par-
tial or total emptying of the system becomes necessary in these cases, it is advisable to
refill with treated water.
The gas must be connected to the corresponding union with a rigid metal pipe.
The gas meter must be adequate for the simultaneous use of all units connected to it.
Carry out the generator gas connection in accordance with current regulations. The di-
ameter of the gas pipe leaving the generator does not determine the diameter of the pipe
between the unit and the meter; it must be chosen according to its length and pressure
loss.
B
Make sure to install a fuel shutoff valve externally with respect to the modules,
enabling the gas to be turned off even without opening the single modules
equipped with key closing.
is equipped on the inside with 3 manifolds (gas, system delivery and
return) and a condensate drain pipe that facilitate cascade connection and also connec-
tion of a single module to the system. The manifolds are sized for a connection in series
of up to 1000 kW.
The cabinet contains a set of 3 seals (2 for water manifolds, 1 for gas manifold) with re-
spective bolts and nuts, to be used for connection to a subsequent module (connection
in cascade). The optional kit code 042027X0, containing 3 blind flanges and 3 drilled
flanges with respective seals and screws, is available on request for the connection to
the system.
After establishing on which side of the module to make the water and gas connec-
tions, connect the flanges with the joining section contained in the kit on that side
after suitably welding them to the system pipes. Make sure to correctly fit the special
seals contained in the kit.
Connect a Ø40 pipe to the condensate drain pipe for removing the condensate pro-
duced during operation (see fig. 48).
Fit the blind flanges contained in the kit on the opposite side of the module, placing
the special seals in between.
5
Gas inlet
System delivery
System return
Condensate drain
Blind flanges - kit 042027X0 (optional)
Blind flanges - kit 042027X0 (optional)
2
2
1
1
3
3
7
4

Publicidad