Descargar Imprimir esta página

Ferroli ENERGY TOP B Instrucciones De Uso, Instalación Y Mantenimiento página 68

Ocultar thumbs Ver también para ENERGY TOP B:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21
Insert the fume dampers (fig. 46), loosening screw "D", and correctly fit them on the fume
manifold. Then tighten screw "D" (fig. 47).
B
The boiler has an internal condensate drain trap connected to an internal con-
densate outlet manifold.
1
Place the Ø40 pipe 1 (not supplied) on the side of the generator.
Slide the pipe 2 towards the arrow side at least 2-3 cm in order to insert it in the
pipe 1.
All manuals and user guides at all-guides.com
1
A
cod. 3540S736 - Rev. 00 - 09/2013
2
Place the Ø40 pipe 1 (not supplied) on the side of the generator
Slide the pipe 2 (of each generator) towards the arrow side at least 2-3 cm in
order to insert it in the pipe 1.
All adjustment, conversion, startup and maintenance operations described below must
only be carried out by Qualified Personnel (meeting the professional technical require-
ments prescribed by current regulations) such as those of the Local After-Sales Techni-
cal Service.
declines any liability for damage and/or injury caused by unqualified and un-
authorised persons tampering with the unit.
The unit can operate on natural gas or LPG and is factory-set for use with one of these
two gases, as clearly shown on the packing and on the dataplate. Whenever a gas dif-
ferent from that for which the unit is arranged has to be used, a conversion kit will be re-
quired, proceeding as follows:
1.
Disconnect the power supply to the boiler.
2.
Using the special key supplied, open the cabinet of the upper exchanger body.
3.
Detach the electrical connections from the gas valve controller.
4.
Loosen the
e ) fixing ring fig. 50"A"fig. 51.
5.
Undo the two fixing screws
for the model
.
B
B
2
and remove the fan assembly as indicated in fig. 50
and in for fig. 51 the model
A
B
A
B
B
1
A
B

Publicidad

loading