Electrical Installation; Pre-Installation - DURAVIT Blue Moon Instrucciones De Montaje

Ocultar thumbs Ver también para Blue Moon:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 12

Electrical installation

Power supply
Circuit breaker
RCCB

Pre-Installation

> Installing a permanent power supply line:
• Install separate circuit breaker and residual­current
circuit breaker (RCCB) upstream
• Connect all pole disconnector mains switch upstream
located outside specified protection zones (0 ­ 2)
• Leave 3000 mm of feed cable exposed
> Laying an equipotential bonding cable:
• Leave 3000 mm of cable exposed
17
Connecting the whirltub (Diagram 17)
Malfunctions due to incorrect
NOTICE
installation!
> Do not fasten the cables together with cable ties.
> Do not install the supply line parallel to the control
cables.
I
Connect the supply line to the mains supply socket.
II
Connect the potential equalisation cable to the
whirltub.
76xxxx xx x xx xx00: 50 Hz, 220 ­ 240 V AC
76xxxx xx x xx xx06: 60 Hz, 220 ­ 240 V AC
76xxxx xx x xx xx16: 60 Hz, 110 ­ 120 V AC
I
= 16 A
N
I
≤ 30 mA
ΔN
Safety areas in accordance with DIN VDE 0100­701
0
6 0
1
0
I
L
N
PE
II
6 0
0
* or the height
2
of the highest
shower head /
water outlet that
is permanently
installed,
depending on
which is higher
WH_M_BlueMoon_with panel/21.04.3
7

Publicidad

Tabla de contenido
loading

Tabla de contenido