Electrical Installation; Pre-Installation - DURAVIT Combi L Instrucciones De Montaje

Bañera de hidromasaje con faldón acrílico moldeado / monolith
Ocultar thumbs Ver también para Combi L:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 12

Electrical installation

Power supply
Fuse protection
RCD

Pre-installation

>
Installing a permanent power supply line (Combi/Jet L
with temperature module lay second supply lines):
Pre-connect a separate fuse and
residual current operating device (RCD)
Pre-connect an all-pole separating main switch
outside the prescribed safety areas (0 - 2)
Allow the supply line to protrude by 3,000 mm
>
Laying the potential equalisation cable:
Allow the cable to protrude by 3,000 mm
18
connecting the whirltub (Diagram 18)
NotE! Avoiding any malfunctions!
Do not fasten the cables together with cable ties.
Do not install the supply line parallel to the control
cables.
I
Connect the supply line to the mains supply
socket.
Combi/Jet L with temperature module: connect
second supply line to the mains supply socket.
II
Connect the potential equalisation cable to the
whirltub.
50 Hz: 230 V~AC
60 Hz: 220 V~AC
I
= 16 A
N
I
≤ 30 mA
ΔN
0
6 0
1
0
I
L
N
PE
II
WH_M_Paiova_angeformte_Verkleidung_Monolith/11.10.1
6 0
0
2
3
* or the height of
the highest shower
head / water outlet
that is permanently
installed; depending
on which is higher
7

Publicidad

Tabla de contenido
loading

Tabla de contenido