EN
Commissioning
Putting the device into operation
Prerequisite
– The function tests were performed successfully.
– The device is installed correctly.
1
Remove the spray shield.
2
Clean the device.
3
Close the WC seat and WC lid.
4
Mount the design cover.
28
All manuals and user guides at all-guides.com
5
Result
ü The device is ready for operation and can be
Remove the protective foil from the design
cover.
handed over to the customer.
27021599673220363-1 © 11-2017
967.305.00.0 (02)