Carrier XCT 7 40VC009F-7G-QEE Manual De Funcionamiento Manual De Instalación página 19

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 128
Installation Procedures
k Installing Hanger Bolt
Use M10 hanger bolt (prepared on the site) featuring 60mm hole depth, fix the clearance as per the size proposed in the
air conditioner external view. Install according to the different building structure specifications to guard against safety faults.
Leveling instruments shall be available to ensure balanced installation.
Dotted line suggests
position behind the unit;
please cut off before use.
l Please use hexagon bolts for installation.
Position of Hanger Bolt
B(mm) (internal hanging)
12
Indoor Unit
Bolt

Publicidad

Tabla de contenido
loading

Tabla de contenido