Assembly And Adjustments - Power smart DB7624E Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY AND ADJUSTMENTS

The following section describes steps necessary to prepare the snow thrower for use. If after reading this
section, you are unsure about how to perform any of the steps please call 800-791-9458 Mon -
EST for customer service assistance. Failure to perform these steps properly can damage the snow
thrower.
Unpacking
Unpack the snow thrower and all its parts, and compare against the list below.
1. Snow Thrower
2. Discharge Chute Assembly
3. Chute Rotation Handle
4. (Qty. 2) one set of Skid Shoes with attaching hardware
5. (Qty. 4) extra M6 Shear Pins and M6 Locknuts
ASSEMBLY
Your Snow Thrower will require some assembly. Please complete the following steps before using your
Snow Thrower.
WARNING: This snow thrower is heavy. Assembly procedures may require lifting
equipment utilizing two people.
Step 1: Installing the Upper Handle
1. When installing the Upper Handle, please note that the Drive, Auger & Shift Cables will already be
pre-attached to Upper Handle.
2. Attach Upper Handle using the Frame Handle Assembly Hardware (Qty. 4 sets /Knob, Saddle
Washer, M8 Nut, T-Screw) for your Upper & Lower Handle connection.
3. VERY IMPORTANT!!!*** When attaching Assembly Hardware, make sure ALL cables are
underneath the Frame (Upper & Lower) Handles after installation as indicated in Figure 1.
***Assembling Drive, Auger & Shift Cables over the top of the Frame Handle will
cause unnecessary tension in the cables, resulting in the Snow blower propelling
forward when starting the engine and may cause damage to the drive & auger control
(levers) when trying to engage them.
Figure 1
12
-5

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido