Power smart DB7624E Manual De Instrucciones página 19

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Wait until the auger and impeller have come to a full stop.
5. Clear any visible jams using the clean out tool attached to your machine.
WARNING! DO NOT try to clear jams with your hands or feet.
AUGER SHEAR PINS REPLACEMENT
Shear pins are used to attach the auger shaft to the auger
blades. A clog or jam in the augers may cause one or
multiple shear pins to break. The shear pins are a safety
mechanism and designed to break under high load or impact
and protect the auger drive system from damage.
Replacement shear pins and nylon locknuts are provided
with your snow thrower.
For additional replacement shear pins, please call the
customer service department at 800-791-9458 .
1. Turn off the engine and wait for all moving parts to come to a complete stop. Remove any remnants
of the broken shear pin. It may be necessary to unscrew the nut from the broken shear pin and drive
out the broken pin.
2. Insert a new shear pin through the hole in the auger shaft and tighten using the shear pin nylon
locknut. Do not over-tighten the nylon locknut.
NOTICE: Never replace the shear pins with standard pins or fasteners. Damage may occur to the snow
blower and drive systems.
DRIVE SPEED CONTROL CABLE ADJUSTMENT
WARNING! Entanglement Hazard – Use caution when performing the speed control cable adjustment.
The speed/gear control lever is connected to two cables that work in tandem to control machine speed and
direction. As the speed/gear control lever is moved from forward to reverse gears (up to down) one cable
is pulled and one is pushed.
Depending on if the cable setting towards forward or reverse, adjustment of the cables will vary.
To adjust the cables, one cable should be moved up and the other down equally in their respective
brackets until there is a positive direction change when the lever is shifted between F1 and R1. The
19

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido